Operator at First Independent Power Limited (FIPL)
First Independent Power Limited is a company in the business of power generation in Nigeria located in Rivers State. We own and operate 4 gas turbine power plants within Rivers State located in Trans-Amadi Port-Harcourt, Afam, Omoku and Eleme.
FIPL currently has a combined installed capacity of 541MW. FIPL has a vision of being the largest and most stable power generation company in the South-South region of the country while contributing significantly the power grid of Nigeria and thereby catalyzing the socio-economic growth of the nation. In FIPL, we have a very dynamic team of intelligent, driven and innovative young men and women who continually work to ensure that the vision of the business is progressively realized.
Monitor, control, and operate plant equipment to ensure safe, efficient, and continuous power production.
Operate rotating, static, and auxiliary plant equipment.
Control power-generating equipment using control boards or semi-automatic systems. Respond to readings from charts, meters, and gauges and support preventive and corrective actions.
Start or shut down auxiliary units and follow valve and switch operating sequences, including black start awareness.
Record operational data, logs, and reports and support parts, tools, and task documentation.
Requirements
Technical qualification in Engineering or related discipline
Plant operations experience is an advantage
Strong safety awareness.
